Our view, checked against public records.
How big operations move dirt
Last checked against records:
Agriculture
Tilling, harvesting and wind across bare fields all raise dust. Utah’s fugitive dust rule exempts agriculture and horticulture[20, Overview table], so farm dust is handled through voluntary practices such as keeping crop residue on fields, avoiding tillage on windy days and planting windbreaks.
Construction, including track-out
Grading, digging, hauling and wind on cleared ground all add dust. EPA’s rough factor for construction is 1.2 tons of total suspended particulate per acre per month of activity, measured around apartment and shopping-center projects[3, p. 13.2.3-1]. EPA says this factor gives high estimates for PM10 and recommends breaking a project into its separate operations for a better estimate[3, p. 13.2.3-1].
“Track-out” is mud and dirt carried onto paved streets on truck tires. Once it dries, traffic grinds it into road dust. R307-309 has a section for construction and demolition activities[14, R307-309-8].
Standard controls:
- Water or stabilize disturbed ground and haul routes
- Limit how much ground is open at one time, and cover or re-vegetate idle areas
- Gravel pads, wheel washes or sweeping at exits to stop track-out
- Cover loads and reduce speed on site
Mining, quarries and bulk handling
At a quarry the main dust sources are haul roads, drilling and blasting, crushing, conveyor drops and stockpiles. EPA’s measured silt content for haul roads to and from stone-quarry pits ranges from 5.0% to 15%, with a mean of 8.3%[2, Table 13.2.2-1].
The fine share differs by source. For unpaved haul roads, PM2.5 is 0.10 of PM10[2, Table 13.2.2-2]. For material drops onto piles and conveyors it is about 0.15 (0.053 against 0.35)[4, p. 13.2.4-4], and for wind erosion of exposed surfaces 0.15 (0.075 against 0.5, March 2006 draft values)[5].
Utah regulates mining dust in R307-309-10, on top of the general opacity limits and dust control plan[14, R307-309-10]. It also has a section on storing, hauling and handling aggregate[14, R307-309-7].
Standard controls:
- Water trucks or sprays on haul roads; paving or chemical stabilization on long-term roads
- Water sprays or enclosures at crushers, screens and conveyor transfer points
- Dust collection on drills
- Enclosing, covering or stabilizing stockpiles
- Speed limits and covered loads on haul trucks
- Extra watering or reduced work when wind picks up
What the rule requires of all of them
In covered areas, opacity from fugitive dust may not exceed 10% at the property boundary and 20% on site[15, R307-309-5(1)]. Any source of a quarter acre or more must submit a fugitive dust control plan[15, R307-309-5(2)], and regulated activities may not start until the plan is approved[17, R307-309-6(2)]. See Utah rules in plain words.
Sources on this page
- [2] AP-42, Section 13.2.2: Unpaved Roads. U.S. EPA, November 2006. Checked 2026-11-25.
- [3] AP-42, Section 13.2.3: Heavy Construction Operations. U.S. EPA, January 1995. Checked 2026-11-25.
- [4] AP-42, Section 13.2.4: Aggregate Handling and Storage Piles. U.S. EPA (copy filed at NRC, ML11182C059), November 2006. Checked 2026-11-25.
- [5] AP-42, Section 13.2.5: Industrial Wind Erosion (March 2006 draft). U.S. EPA, March 2006 (draft). Checked 2026-11-25.
- [14] Utah Admin. Code R307-309: Nonattainment and Maintenance Areas for PM10 and PM2.5: Fugitive Emissions and Fugitive Dust. Utah Division of Air Quality (rule text via Utah Office of Administrative Rules), current rule. Checked 2026-11-25.
- [15] Utah Admin. Code R307-309-5: General Requirements for Fugitive Dust. Utah Admin. Code (reproduced by Cornell LII), current rule. Checked 2026-11-25.
- [17] Utah Admin. Code R307-309-6: Fugitive Dust Control Plan. Utah Admin. Code (reproduced by Cornell LII), current rule. Checked 2026-11-25.
- [20] Fact Sheet: R307-309 Nonattainment and Maintenance Areas for PM10 and PM2.5 Fugitive Emissions and Fugitive Dust. Utah Division of Air Quality, January 2016. Checked 2026-11-25.